Manufactured Capital

MANUFACTURED
CAPITAL

MATERIAL
ISSUES

  • Health and safety
  • Project execution
  • Pricing and the availability of electricity
  • Raw material availability
  • Business continuity and profitability
  • Investing in new technology to increase energy efficiency
  • Industrial action
  • Community issues

Manufactured capital in the mining context relates to the mining and smelting process and how it is conducted, and the assets, which are being mined and beneficiated. It is important to an organisation’s sustainability because its efficient use allows an organisation to be flexible and innovative and increases the speed at which it delivers.



We enhance our manufactured capital by:

  • employing our infrastructure, technologies and processes to use our resources most efficiently; and
  • devising technology and management systems that reduce our waste and emissions.

Glencore-Merafe Chrome Venture operations

  1. Rustenburg ferrochrome plant and Tswelopele pelletising and sinter plant
  2. Boshoek ferrochrome plant and Motswedi pelletising and sinter plant
  3. Boshoek mine
  4. Wonderkop ferrochrome plant and Bokamoso pelletising and sinter plant
  5. Waterval (east and west) and Marikana mines
  6. Kroondal mine
  7. Thorncliffe mine
  8. Lion ferrochrome plant
  9. Lydenburg ferrochrome plant
  10. Helena mine
  11. Magareng mine

KEY POINTS – 2018

 

Merafe attributable ferrochrome production

407kt

(2017: 395kt)

1 fatality

(2017: 1)

No industrial action

Improved TRIFR performance of

3.39

(2017: 3.74)

Mined chrome ore production up
by 2.4%

Cost management


Overview

Attributable ferrochrome production increased to a new record high of 407kt during 2018, which is equivalent to installed capacity utilisation of 85%.

A number of annual production records were achieved during 2018, including all time high production levels for the Lion Smelter and the Wonderkop Smelter.

An annual production record was also achieved by the Bokamoso Sinter Plant at the Wonderkop Smelter.

The production performance did not only result in higher volumes, but also resulted in excellent cost performances. The increase in total unit production cost year on year was contained to 9%, despite the significant increase in the reductant consumption price of 23% and the electricity price increase of 5.2%.

Safety

The Venture continues to place maximum focus on safety. Unfortunately, despite this effort, we are sad to report that there was a fatal accident in the operations of the Venture during 2018 as referred to more fully in the report of the CEO and the report of the Chairperson.

A number of safety campaigns have been undertaken since the onset of the Venture in 2004 as part of the ongoing efforts to improve on the safety performance. This was indeed achieved as evident in the graph below where the total recordable injury frequency rate (TRIFR) reduced to levels around 4 over the past few years. See Human capital of this report for a summary of the Venture’s approach and performance in respect of safety and health for 2018.

Ref. YTD 2016 2017   2018  
FFR 0.04 0.04   0.03  
LTIFR 1.21 1.04   1.26  
TRIFR 4.15 3.74   3.39  
DISR 111.49 145.62   116.43  

Eskom

Our furnaces are fully dependent on a reliable and cost effective supply of electricity from Eskom. Following a period where Eskom anticipated excess generation capacity and was trying to promote incremental electricity consumption, the situation has weakened to a point currently where the Utility has been forced to implement load curtailment again.

Lower electricity sales, higher costs of primary energy and large overexpenditures on their new build programme placed enormous pressure on Eskom's financial situation. The Regulator allowed a 5.2% tariff increase on 1 April 2018 for the 2018/19 financial year. NERSA has, however, meanwhile approved an increase of 4.4% in 2019/20 (held for a four year period) under the Regulatory Clearance Account. In addition, Eskom has applied for a 15% increase in tariffs for each of the next three years under MYPD4. For further discussion on Eskom and pricing rates I refer you to the CEO's strategic review.

The benefits to the Venture of investing into energy efficient projects like Lion phases 1&2, Bokamoso and Tswelopele has shown to be extremely significant and the benefits compared to other ferrochrome producers will increase with future electricity price increases.

Chrome ore production

The Chrome mines (including UG2) produced a new record annual total with saleable chrome ore production at 2.4% more than the previous period.

Higher volumes (15.3%) at the UG2 Operations were mainly due to better recoveries achieved and more feed received from external PGM concentrators.

Chrome produced at the Mines in 2018 was 4.7% less than the previous year due to section 54 stoppage (one fatality), Eskom power failures and Plant breakdowns.

From the Resources and Reserves Statement of this report it is clear that the Venture has more than sufficient ore available at the current rate of mining. If inferred reserves set out in the Mineral Resources and Reserves Statement are excluded, the total life of mine is still calculated at more than 30 years.

TRIFR 2004 – 2017

 

Power and ore consumption efficiencies

  MWh per tonne of ferrochrome

  Tonnes of ore per tonne of ferrochrome

The Glencore-Merafe Chrome Venture's operations

Ferrochrome
plants
Capacity Technology Mines
Western Limb (North West province)
Wonderkop 553 000
tpa FeCr
Bokamoso pelletising and sintering plant
using Outotec technology
Kroondal, Waterval and Marikana
  6
furnaces
Conventional semi-enclosed furnaces  
Rustenburg 430 000
tpa FeCr
Tswelopele pelletising and sintering plant
using Outotec technology
Kroondal, Waterval and Marikana
  6
furnaces
Conventional semi-enclosed furnaces  
Boshoek 240 000
tpa FeCr
Motswedi pelletising and sintering plant
using Outotec technology
Waterval, Kroondal and Boshoek
  2
furnaces
Enclosed furnaces  
Eastern Limb (Mpumalanga and Limpopo provinces)
Lydenburg 396 000
tpa FeCr
Premus – kilns Thorncliffe, Helena and Magareng
  4
furnaces
Three enclosed furnaces and one semi-enclosed
furnace
 
Lion Phase I 360 000
tpa FeCr
Premus – kilns Thorncliffe, Helena and Magareng
  2
furnaces
Enclosed furnaces  
Lion Phase II 360 000
tpa FeCr
Premus – kilns Thorncliffe, Helena and Magareng
  2
furnaces
Enclosed furnaces  

The Venture has access to various UG2 plants, in the Western Limb including EPL, Kanana, Kl, K2, K4 and Rowland, and Mototolo in the Eastern Limb.